This site is not affiliated with AGCO Inc., Duluth GA., Allis-Chalmers Co., Milwaukee, WI., or any surviving or related corporate entity. All trademarks remain the property of their respective owners. All information presented herein should be considered the result of an un-moderated public forum with no responsibility for its accuracy or usability assumed by the users and sponsors of this site or any corporate entity.
The Forum Parts and Services Unofficial Allis Store Tractor Shows Serial Numbers History
Forum Home Forum Home > Allis Chalmers > Farm Equipment
  New Posts New Posts
  FAQ FAQ  Forum Search   Events   Register Register  Login Login


7080 dual PTO install

 Post Reply Post Reply Page  <12
Author
Message
 Rating: Topic Rating: 1 Votes, Average 5.00  Topic Search Topic Search  Topic Options Topic Options
LB0442 View Drop Down
Orange Level
Orange Level
Avatar

Joined: 27 Dec 2014
Location: Boise ID
Points: 767
Post Options Post Options   Thanks (0) Thanks(0)   Quote LB0442 Quote  Post ReplyReply Direct Link To This Post Posted: 10 Feb 2020 at 9:42pm
Yes the 2 splined gears go on one end of the shaft and the clutch pack and driven gear go on the other end.  Once you get the splined gears on with the bearing and snap ring installed you press them down against that bearing, that takes up the slack there.  Then on the other end you will install the clutch pack and gear and tighten that stake until you get the preload.  That shaft cannot go all the way through everything as the splines stop it you have to work from each end.  The center of the shaft has 2 orings for pressure flow to the clutch.  Here are a few pages from the FSM might make it a little clearer.







Back to Top
Sponsored Links


Back to Top
tornado8070 View Drop Down
Orange Level
Orange Level


Joined: 24 Mar 2013
Location: MI
Points: 1341
Post Options Post Options   Thanks (0) Thanks(0)   Quote tornado8070 Quote  Post ReplyReply Direct Link To This Post Posted: 11 Feb 2020 at 6:49am
Thank you. This explains it better than my 8000 series service manual. And the pictures are not blurry.
09’ DT205B, 08’ DT220A, 83' 8070 MFWD, 83’ 8070 85’ 8050 MFWD, 83' 8030, 82' 8010, 85’ 6080 MFWD, 84’ 6080, 79' 7020, 85' M3 RWD, 85' 920 diesel,AC C-50 forklift.
Back to Top
PAFarmer View Drop Down
Bronze Level
Bronze Level
Avatar

Joined: 06 Oct 2020
Location: Pennsylvania
Points: 114
Post Options Post Options   Thanks (0) Thanks(0)   Quote PAFarmer Quote  Post ReplyReply Direct Link To This Post Posted: 10 Mar 2021 at 3:34pm
Thank you for all the effort in this.  It's really a good thing to have.  

For what it's worth,  I archived this post on the internet WayBackMachine just in case...
Back to Top
 Post Reply Post Reply Page  <12
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.10
Copyright ©2001-2017 Web Wiz Ltd.

This page was generated in 0.047 seconds.


Help Support the
Unofficial Allis Forum